Manufacturing Method Of New Fluorine-lined Ball Valve
With the development and progress of industry, Lined Ball Valve has been widely used in industrial water supply. The fluorine-lined ball valve has high dynamic toughness, excellent weather resistance and radiation resistance. The existing fluorine-lined ball valve has certain disadvantages when used. First, it cannot enhance the airtightness of the interface and prevent water seepage from the interface. Secondly, it cannot detect the flow of water inside the fluorine-lined ball valve, is not easy to regulate, cannot facilitate the use of the handle, cannot speed up the adjustment speed, and is more troublesome to operate, which has a certain impact on people's use process. For this reason, we propose a new type of fluorine-lined ball valve.
A new type of fluorine-lined ball valve comprises a main frame, a No. 1 flange is fixedly installed on the outer surface of one side of the main frame, a water inlet is provided in the center of the outer surface of one side of the No. 1 flange, a polytrifluoroethylene layer is provided on one side of the water inlet, a polyphenylene sulfide sealing ring is fixedly installed inside the polytrifluoroethylene layer, a hole is provided on one side of the trifluoroethylene layer, the hole is fixedly installed on the outer surface of one side of the No. 1 flange, a fixing platform is fixedly installed on the upper outer surface of the main frame, a connecting platform is provided on the upper outer surface of the fixing platform, No. 1 bolts are provided on the corners of the upper outer surface of the connecting platform, the connecting platform is fixedly connected to the fixing platform by the No. 1 bolts, a support platform is provided in the center of the upper outer surface of the connecting platform, the upper end of the support platform A handle is provided at the center of the outer surface, and No. 2 bolts are provided around the handle, and the No. 2 bolts are installed on the outer surface of the upper end of the support platform, and the support platform is fixedly connected to the connecting platform through the No. 2 bolts. An electromagnetic flowmeter is fixedly installed on the outer surface of the front end of the main frame, and a main docking plate is fixedly installed on the outer surface of the other side of the main frame, and a secondary docking plate is provided on the outer surface of one side of the main docking plate, and a No. 2 flange is fixedly installed on the outer surface of the secondary docking plate away from the main docking plate, an anti-slip cover is fixedly installed on the outer surface of one side of the handle, and a finger groove is fixedly installed on the outer surface of one side of the anti-slip cover, and a display screen is fixedly installed on the center of the outer surface of the front end of the electromagnetic flowmeter, and the electromagnetic flowmeter is electrically connected to the display screen.